Configuring the new master switch – Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual

Page 82

Advertising
background image

Chapter 6: Adding and Removing Switches

82

9. Install the slot cover by positioning it over the slot opening and

tightening the two captive screws.

Figure 44. Installing the Slot Cover

10. Remove the switch from the equipment rack.

11. Go to the next procedure.

Configuring the

New Master

Switch

With the master switch removed from the equipment rack, you are ready
to install and configure the new master switch. This stage includes
configuring the stack ID number and downloading the configuration file.
These steps should be performed before the switch is connected to the
stack.

To configure the new master switch, perform the following procedure:

1. Install the AT-StackXG Stacking Module in the new master switch. For

instructions, refer to “Installing the AT-StackXG Stacking Module” on
page 39.

2. Install the switch in the equipment rack. For instructions, refer to

“Installing the Switches in an Equipment Rack” on page 44.

3. Power on the switch by connecting the power cord to the back of the

switch and to a power source.

AT-LX44CPUCV

R

AT

-LX4

4CPUCV

R

Advertising
This manual is related to the following products: