Allied Telesis AT-9448Ts/XP (Basic Layer 3) User Manual
Page 41
Advertising

AT-9400Ts Stack Installation Guide
41
Figure 10. Installing the AT-StackXG Stacking Module
4. Secure the module to the chassis by tightening the two captive screws
with a cross-head screwdriver. Refer to Figure 11.
Figure 11. Securing the AT-StackXG Stacking Module
5. Repeat this procedure to install an AT-StackXG Stacking Module in the
other switches of the stack.
You are now ready to install the power cord retaining clip, as explained in
the next procedure.
1242
AT-LX44CPU
CVR
AT-Sta
ckXG
Stack Po
rt 1
Stack Po
rt 2
1243
AT
-LX44CPUCV
R
AT-StackXG
Stack Po
rt 1
Stack Po
rt 2
Advertising
This manual is related to the following products: