Preparing interface unit, Names battery installation, E-train data – CatEye MSC Series Download Kit User Manual

Page 8

Advertising
background image

8

e-Train Data™

PREPARING INTERFACE UNIT

Names

Battery installation

Caution

Do not mix new and old batteries together.

Safely dispose of old batteries. Do not place them within children’s reach.

1. Open the battery cover and select the port switch inside. For models that transmit

data through contact (MSC-2Dx and MSC-3Dx), select “C” port. For (future) models
that transmit data by infrared ray, select “IR” port.

2. Install four AAA (LR03) dry batteries.

3. Turn the switch on, and see if the battery indicator turns on.

If not, re-install the batteries again, checking the correct polarity.

The interface unit continues to consume battery when the switch is on.

When not using, turn off the switch to save the battery life.

Reference:

The battery life is approximately 50 hours (alkaline battery). If the battery indicator does
not turn on, replace the batteries with new ones.

OFF

ON

Battery Cover

AAA (LR03) dry batteries

Power Switch

®

OFF

ON

POWER

DOWNLOAD

STAGE

IR

C

Port Switch

Stage

Release-button

Battery indicator

Battery Cover

Hook

Contacts

Infrared-ray receiver

Hook

Power Switch

Advertising