Changing the heel dies – Hawk Industries Hawkjaw Sr. Manual M100K-2GSR Serial Numbers 201 to 370 User Manual

Page 39

Advertising
background image

Maintenance & Repair 37

Changing the Heel Dies

Changing the Heel Dies

Tools Required

3/4" wrench, See Drawings.

INITIAL STEPS

1. Make sure the HawkJaw is off

the drill pipe connection and in

the rest position on the derrick.

2. Shut down the Hydraulic power

unit.

3. Press the Grip button

repeatedly to bleed hydraulic

pressure.

4. Disconnect the Air power

supply.

5. Push in the “E” stop.

6. Assume that there is still a load

on every actuator. Proceed with

caution.

Top Wrench Heel Die

1. Use the 3/4" wrench to remove

the Heel Die Roller Bolts (B)

on the top of the Die Rollers (R).

2. Remove the Roller Bushings (RB).

3. Remove the Heel Die Rollers (R).

4. Pull out the Heel Die Pin (P).

5. Remove the Top Die Retainer (DR).

6. Slide out the worn Die (D).

Continued on next page...

RB B P

R DR

D

DH

Advertising