Goulds Pumps 3640 - IOM User Manual

Page 28

Advertising
background image

Installation

• Puddle with a vibrator.

• Pump the grout into place.

5. Allow the grout to set.

1. Baseplate
2. Shims or wedges
3. Grout
4. Foundation
5. Sleeve
6. Dam
7. Bolt

6. Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48

hours.

1. Baseplate
2. Grout
3. Foundation
4. Dam
5. Bolt

7. Remove the leveling jackscrews after the grout hardens in order to remove any stress

points.

8. Tighten the foundation bolts.
9. Recheck the alignment.

26

Model 3640 Installation, Operation, and Maintenance Manual

Advertising