Local installation, Step 4 powering up the systems – Belkin F1DP116Gea User Manual

Page 26

Advertising
background image

22

Step 4 Powering Up the Systems

4.1 If you have not already done so, power on all servers connected to

the Switch (servers can be powered on simultaneously). The Switch
emulates both a mouse and keyboard on each port and allows
your server to boot normally. The server connected to port 1 will be
displayed on the monitor.

4.2 Check that the keyboard, monitor, and mouse are working normally.

4.3 Using the port selectors, check all occupied ports to verify that all

servers are connected and responding correctly. If you encounter an
error, check your cable connections for that server and reboot. If the
problem persists, please refer to the “Troubleshooting” section in this
User Manual.

Local Installation

Advertising
This manual is related to the following products: