Local installation – Belkin F1DP116Gea User Manual

Page 30

Advertising
background image

26

Getting Started:

1.

Make sure that all servers and Switches are powered off and that each
KVM Switch has been assigned a unique BANK address.

2.

Place the SMB KVM-over-IP Switch and all secondary KVM Switches in
the desired location.

3.

Connect the console monitor, keyboard, and mouse to the console ports
of the SMB KVM-over-IP Switch. Refer to “Connecting the Console to the
Switch” on page 14.

Connecting the Primary and Secondary KVM Switches:

1.

Using the Daisy-Chain Cable (F1D108-CBL-XX), connect one end to the
“Daisy-Chain” port on the SMB KVM-over-IP Switch.

2.

Connect the other end of the Daisy-Chain Cable to the “Primary Input/
Secondary Output” port of the first secondary KVM Switch (BANK 01).

3.

To add secondary units, connect one end of the Daisy-Chain Cable to the
“Secondary Input” on the first secondary KVM Switch and the other end
to the “Primary Input/Secondary Output” port of the next secondary KVM
Switch (for example, BANK 01).

4.

Repeat step 3 for additional KVM Switches you wish to add to your
daisy-chain configuration.

Local Installation

Advertising
This manual is related to the following products: