Complete the installation, Adjust levelling legs, Line up range in front of opening – Bosch BOSCH OVEN User Manual

Page 17: Repeat in right back corner, Slide range into opening, Plug in power cord, Dampen countertop and foam tape with soapy water

Advertising
background image

English 15

9. Tighten each clamping screw with the appropriate torque (See table below).

10. Properly secure flexible conduit at knockout panel on range and at supply

side junction box. The wiring is now complete.

Note: DO NOT plug in range at this time.

Complete the installation

Adjust Levelling Legs

1. Line up range in front of opening.
2. Measure back left corner of opening from floor to top of countertop.
3. Measure back left corner of range to bottom of cooktop trim. Use a wrench to

adjust leveling leg until this height is the same as the corner dimension.

4. Repeat in right back corner.
5. Adjust front leveling legs so that the bottom of the cooktop trim is ½" higher

than the corresponding countertop surface.

Slide Range into Opening

1. Plug in power cord.
2. Dampen countertop and foam tape with soapy water.

Table 4: Appropriate Torque Levels for Aluminum or Copper Wire

Gauge

Torque (in./lbs.)

Torque (Nm)

6

35

3.95

8

25

2.82

Figure 22:

Completed Three Wire Flexible Conduit Connection

green ground screw

Figure 23:

Adjust the Front Leveling Leg

adjustable leg

wrench

drawer

Advertising