A.2 smr-ac system mounting, Smr-ac cafspro main pump system assembly, Figure a-1: lifting the smr-ac system – Hale SMR-U User Manual

Page 38: Smr-ac system mounting

Advertising
background image

SMR-AC Installation and Setup

52

Addendum - SMR-AC CAFSPro Installation Guide

p/n: 029-0020-78-0

WARNING - continued !

PLACE A BRACE, APPROXIMATELY 3’ (1 METER) BETWEEN THE LIFTING
STRAPS / CHAINS TO PREVENT APPLYING EXCESSIVE PRESSURE TO THE
MANIFOLDS AS THE SYSTEM IS LIFTED INTO PLACE. APPLY A STRAP
AROUND THE FRONT SUCTION INLET AS SHOWN TO DEVELOP A THREE-
POINT LIFT, MAKING SURE THE SYSTEM IS BALANCED. ALSO SEE FIG-
URE A-1: “LIFTING THE SMR-AC SYSTEM (THREE-POINT LIFT).”

Figure A-1: Lifting the SMR-AC System (Three-Point Lift)

A.2

SMR-AC SYSTEM MOUNTING

SMR-AC CAFSPro Main Pump System Assembly

When installing the SMR-AC CAFS System to the apparatus chassis, use
accepted practices for mounting. Review previous Section 3 “Receiving
and Inspection” beginning on page 13.
Also see Figure A-2: “Shock Mount-
ing” on page 53.

Advertising