3 installing the air locker, Preload shim measurement – ARB RD110 User Manual

Page 16

Advertising
background image

3 Installing the Air Locker

14

3.5

Preload Shim Measurement

In order to preload the tapered roller bearings in your Air Locker,
measurements need to be taken so that a value can be calculated for
the total shim thickness ‘E’ in Figure 6.














Figure 6.

c Hold the bearing cups in place over their matching bearing cones.
c Insert and hold the Air Locker into the differential housing.
c Insert the shim pack determined earlier as ‘D’ between the bearing

cup and the differential housing (right hand side as shown in Fig.4.)

c Push (or lightly pry) the Air Locker hard across to the right-hand

side, and measure the gap (also called the ‘end float’) between the
bearing cup and the housing with a feeler gauge (See Fig 7.).

c Record this measurement.
c Consult your vehicle manufacturer’s service manual to determine

the carrier bearing preload amount specified for your vehicle.

NOTE : If your service manual specifies preload in terms of a

torque value measured off the drive pinion flange,
then assume a preload amount of 0.25mm [0.01”] for
the following calculations. Once you have assembled
the housing to check the final backlash (Refer to
Section 3.12 Checking the Backlash
) you should verify
that your preload is correct using a torque wrench and
your service manual’s table of values.

Advertising