ARB RD90 User Manual

Page 3

Advertising
background image

Table of Contents:

1

1 Introduction

3

1.1 Pre-Installation Preparation

3

1.2 Tool-Kit Recommendations

4

1.3 Assembly Type Identification

5

2 Removing the Existing Differential

6

2.1 Vehicle Support

6

2.2 Differential Fluid Drain

6

2.3 Removing the Differential Assembly

6

2.4 Checking the Current Backlash Amount

8

2.5 Removing the Differential Center

10

3 Installing the Air Locker

11

3.1 Approximate Backlash Shimming

11

3.2 Calculation & Selection of Backlash Shims

13

3.3 Mounting the Ring Gear

14

3.4 Installing the Carrier Bearings

15

3.5 Preload Shim Measurement

16

3.6 Calculation & Selection of Preload Shims

18

3.7 Drilling & Tapping the Bulkhead Port

19

3.8 Installing the Bulkhead Fitting

21

3.9 Installing the Differential Center

21

3.10 Setting Up the Bulkhead Fitting

24

3.11 Final Assembly

25

3.12 Checking the Backlash

27

3.13 Bench Testing the Air Locker

30

3.14 Reinstalling the Differential Assembly

31

4 Installing the Air System

32

4.1 Mounting the Solenoid

32

4.2 Running & Securing the Air Line

34

4.3 Connection to the Bulkhead Fitting

35

5 Mounting & Connecting the Electrical System

36

5.1 Mounting the Actuator Switch(es)

36

5.2 Wiring the Actuator System

37

6 Testing & Final Assembly

40

6.1 Leak Testing

40

6.2 Testing the Air Locker Actuation

40

6.3 Re-Sealing & Filling the Differential

41

6.4 Note For ADD Equipped Vehicles

41

6.5 Post-Installation Check List

42

7 Parts List

43

7.1 Exploded Assembly Diagram

43

7.2 Itemized Parts List

44

Advertising