Fitting procedure – ARB 3520030 User Manual

Page 8

Advertising
background image

Last Rev Date: 18/07/11

Page 8 of 15

Fitting instructions# 3787968

Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd

FITTING PROCEDURE

NOTE: If fitting winch continue
through step 17, if not skip to step 29

18. For ease of access the winch gearbox

handle needs to be rotated. To do this undo
all the cap screws, carefully lift the gearbox
clear of the winch body so as not to damage
the gasket. (Do not lift the gearbox more
than a couple of millimetres)
Rotate the
gearbox anti-clockwise two hole spaces (72°).
Re-fit the cap screws.

19. Using a 12mm (1/2”) drill bit, drill two new

holes in the roller fairlead 25mm below the
original holes.

Original hole.

New hole 25mm lower.

20. Remove the three screws from the control

box and remove the cover.

21. Replace the two cables marked “A” and “F1”

and replace them with the two cables
(BLB560) supplied with the fitting kit. Label
the cables the same as the original to assist
in the wiring of the winch.

22. Place the winch on a table with the feet

facing up and using an assistant; carefully lift
the bull bar on top of the winch.

23. Attach the winch to the bull bar using two 1

½” x 3/8” bolts from the winch fitting kit, 3/8”
spring washer and 3/8” flat washers in the top
holes.

24. Fit the 4 x M6 cage nuts from inside of the

lower flange on the pan, where the stone tray
will bolt up.

NOTE: Access to this area for cage nut fitment
will be restricted once the RFL is fitted so it is
important to insert these now.

Warning: Drilling operations can result in
flying metal debris, safety glasses should be

F1

A

View on gearbox end

Advertising
This manual is related to the following products: