Bull bar preparation – ARB 3438260 User Manual

Page 11

Advertising
background image

Last Rev Date: 26/6/2009

Page 11 of 18

Fitting instructions# 3787027

Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd

BULL BAR PREPARATION

40. Fit the buffers to either side of the bull bar

using 6 x M6 flange nuts. Do not over
tighten.

41. Fit M6 cage nuts to four holes in lower pan

flange. The nut bodies are inside the bull
bar

IF NOT FITTING A WINCH

42.

Apply rubber mould to edge of winch
hole cover panel and trim off excess.

43. Fit panel to top face on bull bar using 2 x M6

dome head stainless steel screws, flange
nuts and flat washers.

NOTE: The flat washers are to be sandwiched
between panel and top face of bull bar to stop
the panel pulling down to form depression
around screw heads.

Advertising
This manual is related to the following products: