Troubleshooting instructions – L.B. White FA-MCS-D User Manual

Page 17

Advertising
background image

READ THIS ENTIRE SECTION BEFORE
BEGINNING TO TROUBLESHOOT PROBLEMS.

The troubleshooting flow charts on the following pages
provide systematic procedures for isolating problems. The
char ts are intended for use by a QUALIFIED SERVICE
PERSON. DO NOT SERVICE UNLESS YOU HAVE BEEN
PROPERLY TRAINED.

Components should be replaced only after each step has
been completed.

Use the green LED on the programmable controller for
assistance in troubleshooting if problems occur. A blink
pattern of 1 second ON, 1 second OFF indicates normal
operation.

TEST EQUIPMENT REQUIRED

• Digital Multimeter - for measuring AC and DC voltage and

resistance.

INITIAL PREPARATION

Check all internal wiring for loose connections and
worn/damaged insulation.

Problems

Page

Green LED on controller is steady ON . . . . . . . . . . . . . .18

Green LED on controller is OFF. No display at touch
pad, indicator lights are out,heaters do not operate . .18

Green LED on controller is blinking 0.5 seconds ON,
0.5 seconds OFF. Red sensor failure light is on . . . . .19

Heaters do not start, zone light is ON . . . . . . . . . . . . .19

Heaters do not start, zone light is OFF . . . . . . . . . . . .19

Heaters start, zone light is OFF . . . . . . . . . . . . . . . . . .19

Heaters in zone start, but heat output
does not change in response to SmartBox

. . . . . . .20

SmartBox

does not operate . . . . . . . . . . . . . . . . . . . .20

concurrently with room controller

Sequence of Operation

a. 120 VAC is supplied to SmartBox.
b. Call for heat occurs from building controller.
c. Building controller closes heating contacts

enabling SmartBoxoperation.

d. 120 VAC is sent to both transformers and to both

relays.

e. Upper transformer reduces 120 VAC to 24 VAC which

is sent to the programmable controller.

-- Green LED on blinks 1 second ON, 1 second

Off (Normal operation)

f. Lower transformer reduces the 120 VAC to 24VAC

and sends it to both signal conditioners.

g. Programmable controller sends 24 VAC to both

relays.

-- 24 VAC is used to close the relay coil.
-- Relays send out 120 VAC for power supply to

heaters.

-- Heaters start the ignition cycle

h. Programmable controller sends out 4-20 mA signal to

the signal conditioners.

i. Signal conditioners use the 4-20 mA signal to change

the received 24VAC into 0-15 VDC output.

-- Signal conditioner sends the 0-15 VDC to the

heater’s variable rate gas control.

j. Ignition of gas occurs at a specific rate.

-- Room warms to desired temperature.

k. Building controller and SmartBoxwork

simultaneously to monitor temperature until heat
demand is satisfied.

Troubleshooting Instructions

WARNING

Electrical Shock Hazard

Troubleshooting this system may require operating the
unit with line voltage present. Use extreme caution
when working on the

SmartBox.

Failure to follow this warning may result in personal
injury or death.

17