Floating valley – Mueller Snap Lock (MSL) User Manual

Page 20

Advertising
background image

20

FLOATING VALLEY

Installation Steps: (use only with fixed Ridge/Hips)

1. Install four runs of hat section/channel up the valley as shown, securing to the purlins with #10 x 1 self drill

pan head screws (this step is applicable only when insulation or thermal blocks are specified).

2. Install the two piece 14 ga. Valley Support Plates with #10 x 1 self drill pan head screws.

3. Install Valley Trim over the Valley Support Plates. Secure with #10 x 1 self drill pan head screws (5’ centers).

4. Install butyl tape sealant 4” to 5” from center of the valley trim.

5. Install edge plates over the butyl tape sealant using #10 x 1 self drill pan head screws on 12” centers.

6. Field cut and hem panel ends. Install over edge plate.

7. Seal the ends of the panel legs using tube sealant.

Mueller Lock

Panel

Valley

Trim

#12 x 1 1/4" Self Drill

Tek Screw

4" Typical

#10 x 1" Pan Head

Self Drilling Screw

on 24" Center

2 - Piece, 14 ga.,

Valley Plate

Tape

Sealant

Purlin

Purlin

Edge Plate

#10 x 1" Pan Head

Self Drilling Screw

Advertising