Fixed ridge & hip | wood deck, Ridge screw sequence – Mueller Snap Lock (MSL) User Manual
Page 37
Advertising

37
Installation Steps: (use only with floating eave and valley)
1. Install the butyl tape sealer across the panel, aligned to accommodate ridge trim and end dam.
2. Fasten end dam through butyl tape sealant and panel to deck using 1 ½” wood grip screws on 4” centers.
3. Use butyl caulk to seal the ends of the end dam.
4. Apply butyl tape sealant to the top of the end dam.
5. Fasten Ridge trim to end dam using #14 x 7/8 lap screws on 6” centers.
Ridge Screw Sequence
Clip
Mueller Snap
Lock Panel
Tape
Sealant
Tape Sealant
Tube Sealant on
Vertical Edges
Ridge Trim
End Dam
#14 x 7/8" Lap
Tek Screw
6"
6"
2"
#10 x 1"
Pan Head
Woodgrip Screw
Wood Deck
Underlayment
FIXED RIDGE & HIP
|
WOOD DECK
Advertising