Side wall / parapet details | wood deck, Installation steps – Mueller Snap Lock (MSL) User Manual
Page 39

39
14ga Slotted
Rake Angle
Rake Trim
Support Angle
Counter Flashing by Others
#14 x 7/8" Lap Tek Screw
Side Wall Trim
#12 x 1 1/4" SD Tek Hex with Washer
Tri-Bead
Sealant
#14 x 1 1/4
" SD
Shoulder Screw
Wood Deck
Underlayment
Installation steps:
1. To begin starting panel first attach the Slotted Rake Angle to the existing wood deck using #14 x 1¼”
SD Shoulder tek screws as shown.
2. Place the female leg of the first panel over the upturned edge of the Slotted Rake Angle.
3. Install Rake Trim Support Angle as pictured using tri bead sealant and secure using #12 x 1¼” SD screws thru
the Rake Trim Support Angle, tri bead, panel leg and into the 14 ga. Slotted Rake Angle.
4. Apply tri bead to the top of the Rake Trim Support Angle and install side wall trim as shown with #14 x 7/8”
lap screws on 6” centers.
5. Attach the appropriate counter flashing as required by the application. This is supplied by others.
6. For last panel run, field cut the panel if necessary to form a 1 ¾” up turned leg that will position against the
slotted rake angle when installed. Then complete the trim using the above steps.
SIDE WALL / PARAPET DETAILS
|
WOOD DECK