JB Conversions 2307 LoMax 300 User Manual

Page 10

Advertising
background image

19)

Begin installation of the shift rails by mounting the bearing retainer housing

in a smooth-jaw clamp. Install two new springs (Fig.18) into each of the

two vertical bores in the housing. These springs, which can be purchased

as an option, are stiffer than stock therefore reducing the tendency of twin

stick arrangements to cause the tcase to pop out of gear while under load.

Fig.18

20)

Place the original detent ball on top of the exposed spring in the left bore

(Fig.19). Begin this procedure on the left rail as shown. Position the proper

shift rail (Fig.19a) with the end-slot facing vertical. Push the rail up to the

detent ball.

Fig.19

Fig.19a

Advertising