JB Conversions 2307 LoMax 300 User Manual

Page 20

Advertising
background image

43)

Roll the idler gear into place rotating it as it is lowered (Fig.42)

Fig.42

44)

When the idler gear is located properly, the cross shaft can be easily pushed

through the center of the idler gear. Pay close attention to be sure all of

the needle bearings remain in place during this procedure. Align the cross

shaft with the flat side in the position shown. This will allow the retainer

plate and bolt to be installed after the cross shaft is tapped into the final

position (Fig.43). Install the shift rail caps if they have been removed.

Fig.43

Advertising