JB Conversions 2307 LoMax 300 User Manual

Page 18

Advertising
background image

38)

Bolt the housing in place. Install the 2 set screws into the forks using

Loctite (Fig.37,37a). You will need to verify shaft end play at this point.

End play should be 0.003”-0.006” on the front output shaft. If new

bearings were installed, you may need to adjust the shim pack noted in step

35. Once proper end play is verified, remove the bearing plate installed in

step 35, apply a seal with RTV and reinstall. Install the front output shaft

seal (available with the optional Seal & Gasket Kit), yoke, and nut. Torque

to 100 lb.ft..

Fig.37

Fig.37a.

39)

Install the needle bearings into the idler gear using a thick grease (Fig.38).

Remember to install the three steel rings along with the needle bearings.

Be sure that all needle bearings are installed.

Fig.38

Advertising