Lull 1044C-54 Series II Service Manual User Manual

Page 205

Advertising
background image

Boom and Transfer

31200079

6-63

a. With the outriggers up, extend the boom, noting that Boom

Extension proximity light illuminates when the boom is extended to
specified distance (approximately 21 feet with tilting tower or 25
feet with standard carriage). If light does not illuminate, stop and
retract the boom. See page 6-119 for adjustment procedures.

b. Retract and lower boom to ground and shut off engine.

c. Complete proximity switch adjustment before proceeding to

Step 18.

18. Inspect hydraulic connections for leaks and tighten as necessary.

19. (Ref. Fig. 6-59) Install boom cover (Item 4) with six (6) each

flatwashers (Item 3), lockwashers (Item 2), and nuts (Item 1). Tighten
nuts to 180 in-lbs.

Boom Disassembly

4-Section Boom

1. Remove boom assembly from machine.

2. Place boom assembly on work stands in upside down position.

CAUTION: To avoid personal and equipment damage, make sure that the

boom is properly supported through this entire procedure.

Advertising