Lull 1044C-54 Series II Service Manual User Manual

Page 238

Advertising
background image

Boom and Transfer

6-96

31200079

c. Install auxiliary and front carriage tilt hydraulic tubes on channels

(Item 6) in inside of inner boom section with cushion clamps
(Item 3) as described in Substep d under Step 2 on page 6-68.

24. Install front carriage tilt cylinder in inner boom (See page 6-20).

25. Install auxiliary hydraulic quick disconnects

Fig. 6-101: Slide Pad Installation – Inner Boom Section

26. (Ref. Fig. 6-101) After applying thread locking compound to the

capscrews, install two (2) lower and two (2) side slide pads (Items 1
and 2) on inner boom section according to drawing specifications with
lockwashers (Item 3) and capscrews (Item 4). Torque capscrews to
180 in-lbs.

Fig. 6-102: Grease Hose Installation

J

1247

1

2

3

4

4

3

#

Description

1

Lower Slide Pad

2

Side Slide Pad

#

Description

3

Lockwasher

4

Button-Head Socket Capscrew

J

1

235

3

5

1

4

6

2

#

Description

1

Grease Hose

2

Inner Boom Section

3

Elbow

#

Description

4

Bulkhead Adapter

5

Grease Fitting

6

Grease Fitting Cover

Advertising