Synergy 5221-A - 2011+ Jeep JK 2/4 Door Front Cage Kit User Manual
Page 26
Advertising
36. Next, move back up to the top portion of the behind dash structure. Measure from the
firewall attachment surface back. Mark a line at 2” back and 4” back as shown. In
image 36.1 continue the lines down 2.5” and connect as shown. Move any wiring in
the area out of the way to prevent damage
Note – Some A/C ducting in this area will be trimmed later. Be
careful to not cut it at this time, however all is not lost if some
happens to get accidently nicked from cutting in this step.
Advertising