IKA RV 10 control FLEX User Manual

Page 35

Advertising
background image

­­36

032010

 Feed the steam pipe in until it stops.
 Then lock the locking device by turning it clockwise by 60°

(fig. 10).

 Check the axial locking device on the steam pipe.

Push-off mechanism

The plastic screw nut (H) helps loosen tight-fitting piston ground-in

connections (Fig. 9).
 Hold the locking device and loosen the plastic screw nut (H).
 To do so, hold the tight-fitting evaporator piston and turn the pla-

stic screw nut (H) until the evaporator piston neck.

Before using the device, hand-tighten the plastic screw nut (H)

against the left-hand stop. This will hold the steam pipe locking de-
vice (G) firmly in place.

Fitting the condenser seal

 Place the RV 06.15 or RV 06.13 condenser seal in the condenser

receptacle and fit the glassware to the device according to the as-
sembly instructions (Fig. 11 a,b, c and d).

Fig. 10

Fig. 11b

Fig. 11a

First use - Fitting the seal RV 06.15/RV 06.13

 Insert vapour tube (1).
 Insert seal RV 06.15 (2).
 Slide the union nut (3b) over the flange on the condenser (3a).
 Also slide the annular spring (3c) over the flange on the condenser (3a).
 Position the condenser (3a) on top of the seal (2).
 Tighten the union nut (3b) by hand onto the threaded flange. Run the

device for 20 minutes at 120 rpm. Finally, retighten the union nut (3b) by
hand.

Note: Follow the mounting instructions for the glassware

Assembling the vertical glassware cooler locking device

 Assemble the condenser locking device according to the diagram

(fig. 12).

 Mount the plate (I) using the thumb screw (J).
 Put the support rod (L) on the plate (I) and attach it with the screw

nut (K).

 Attach the rubber protector (M).
 Fasten the Velcro band (N) to the support rod (L).
 Secure the vertical glassware with the Velcro band (N).

1

2

3a

3b

Fig. 11c

Fig. 12

J

I

L

K

N

M

H

Fig. 11d

3c

Advertising
This manual is related to the following products: