JLG 450AJ Service Manual User Manual

Page 53

Advertising
background image

SECTION 2 - PROCEDURES

3120869

– JLG Lift –

2-37

2.

Place one spacer (3D) inside cluster gear (3F) so
that it rests on top of the needle rollers.

3.

Line the remaining half of cluster gear (3F) with 16
needle rollers.

4.

Set carrier housing (3A) on table, sideways. Insert a
planet shaft (3E), roll pin hole last, into one of the
planet shaft holes from roll-pin-holed side of carrier
housing (3A).

5.

Place one thrust washer (3B) onto the end of planet
shaft (3E) inside carrier. Fit tang of thrust washer into
the slot on the inside edge of the planet shaft hole.

6.

Following the thrust washer, place the cluster gear
(3F), large end toward roll pin hole in carrier hous-
ing, onto the planet shaft (3E).

7.

Following the cluster gear, place one more thrust
washer (3B) onto planet shaft (3E) through the
opposite planet shaft hole in carrier housing (3A).

Advertising
This manual is related to the following products: