JLG 450AJ Service Manual User Manual

Page 54

Advertising
background image

SECTION 2 - PROCEDURES

2-38

– JLG Lift –

3120869

8.

Use an alignment punch or similar tool to align the
roll pin holes in carrier housing (3A) and planet shaft
(3E).

9.

Drive roll pin (3G) down into the aligned roll pin
holes in carrier housing (3A) and planet shaft (3E).

10.

Repeat steps 1 thru 9 to assemble and install the
two remaining cluster gears.

Assembly of the Cover

1.

Using the disconnect rod, push o-ring (6F) into the
groove inside the cover cap (6B).

2.

Place the o-ring (6G) onto the cover cap (6B) so that
it rests against the flange of the cover cap.

3.

Insert disconnect rod (6E) into cover cap (6B).

4.

Set cover (6Aon table, exterior side up. Place cover
cap (6B) onto cover (6A), aligning the pipe plug hole
in the cover cap over the pipe plug hole in the cover.

Advertising
This manual is related to the following products: