JLG 450AJ Service Manual User Manual

Page 60

Advertising
background image

SECTION 2 - PROCEDURES

2-44

– JLG Lift –

3120869

12.

With "X" marked side facing up, place the ring gear
(4) around cluster gears (3F).

NOTE: This will hold the punch marks in position while

installing the carrier into the hub.

13.

Place the carrier sub assembly (3) and ring gear (4)
together into mesh with internal gear (2), aligning
the "X" marked shoulder bolt hole in the ring gear (4)
over one of the shoulder bolt holes in the hub. Mark
the location of shoulder bolt holes on the outside of
ring gear and hub.

NOTE: You may lift the ring gear off the hub to align the

shoulder bolt holes. The ring gear and carrier are
installed together only to keep the punch marks on
the carrier in place.

14.

With the internal splines facing up (counterbore end
facing down), place input gear (8) into mesh with
carrier sub-assembly (3).

15.

Oil all exposed surfaces inside the hub (1G). Place
thrust washer (11) into the counterbore in top of the
carrier.

BEWARE OF SHARP EDGES IN THE COUNTERBORE WHEN YOU
INSTALL THE O-RING.

16.

Set the cover (6A) on table, interior side up. Grease
o-ring (5) and place it into the counterbore around
the edge of cover (6A).

NOTE: The o-ring may be stretched or pinched together to

make it fit the counterbore exactly.

Advertising
This manual is related to the following products: