JLG 450AJ Service Manual User Manual

Page 55

Advertising
background image

SECTION 2 - PROCEDURES

3120869

– JLG Lift –

2-39

5.

Place two of the cover cap bolts (6C) into any two
bolt hoes that are 180° apart on the cover cap (6B)
and tighten bolts.

6.

Using a torque wrench, apply 4 to 5 Nm (36 to 49 in.
lbs.) of torque to both bolts (6C).

7.

With the large end down, place the disconnect cap
(6D) onto the cover cap (6B), aligning the pipe plug
hole in the disconnect cap over the pipe plug hole in
the cover cap.

8.

Place the two remaining bolts (6C) into the bolt
holes in the disconnect cap (6D), and tighten the
bolts.

9.

Using a torque wrench, apply 36 to 49 in. lbs. (4 to 5
Nm) of torque to both bolts (6C).

10.

Apply a light coat of "Never-Seize" to pipe plug (6H)
and tighten it into the pipe plug hole in the cover
(6A).

Advertising
This manual is related to the following products: