JLG 4017RS Operator Manual User Manual

Page 105

Advertising
background image

Section 5 - Attachments

5-25

31200938

Installation Procedure:

Refer to “Attachment Installation” on page 5-10.

Operation:

• Raise or lower boom to appropriate height and close bucket for loading material from

stockpile.

• Align telehandler with face of stockpile and drive slowly and smoothly into pile to load

bucket.

• Tilt bucket up far enough to retain load and back away from pile.

• Travel in accordance with requirements set forth in Section 1 - General Safety

Practices.

• Open bucket or tilt bucket down to dump load.

Equipment Damage Precautions

• Except for lifting or dumping a load, the boom must be fully retracted for all bucket

operations.

• Do not corner-load bucket. Distribute material evenly within the bucket. Bucket

capacity charts are for evenly distributed loads only.

• Do not use bucket as a lever to pry material. Excessive prying forces could damage

bucket or machine structure.

• Do not attempt to load material which is hard or frozen. This could cause severe

damage to quick attach or machine structure.

• Do not use bucket for "back dragging." This could cause severe damage to quick

attach.

Advertising
This manual is related to the following products: