JLG 4017RS Operator Manual User Manual
Page 93
Advertising
Section 5 - Attachments
5-13
31200938
This installation procedure is designed for one-person operation. Prior to exiting cab,
perform “Shut-Down Procedure” on page 4-3.
1. Tilt quick attach forward to provide clearance.
Check to be sure lock pin and retainer pin is out.
2. Align attachment pin recess with attachment pin.
Raise boom slightly to engage attachment pin in
recess.
3. Tilt quick attach back to engage attachment.
4. Insert lock pin and secure with retainer pin.
5. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic Operated
OAM2780
OAM2790
OAM2800
OAM2810
Advertising
This manual is related to the following products: