Warning – JLG 4017RS Operator Manual User Manual

Page 26

Advertising
background image

Section 2 - Pre-Operation and Inspection

2-2

31200938

8. Operational Check - Once the walk-around inspection is complete, perform a warm-

up and operational check (see page 2-8) of all systems in an area free of overhead
and ground level obstructions. See Section 3 - Controls and Indicators for more
specific operating instructions.

WARNING

If telehandler does not operate properly, immediately bring machine to a stop, lower
boom and attachment to ground and stop the engine. Determine cause and correct
before continued use.

Advertising
This manual is related to the following products: