JLG 4017RS Operator Manual User Manual
Page 95
Advertising
Section 5 - Attachments
5-15
31200938
This installation procedure is designed for one-person operation. Prior to exiting cab,
perform “Shut-Down Procedure” on page 4-3.
1. Tilt quick attach forward to provide clearance.
Unhook lock pin handle and pull to disengage lock
pin.
2. Align attachment pin with recess in attachment.
Raise boom slightly to engage attachment pin in
recess.
3. Tilt quick attach back to engage attachment.
4. Push lock pin handle to engage quick attach lock
pin and secure with hook.
5. If attachment is equipped, connect auxiliary hydraulic hoses. See “Hydraulic Operated
OAM2850
OAM2860
OAM2870
OAM2870
Advertising
This manual is related to the following products: