SECTION 3 - CHASSIS & TURNTABLE

3-54

– JLG Lift –

3120718

3.17 DUAL FUEL SYSTEM

IT IS POSSIBLE TO SWITCH FROM ONE FUEL SOURCE TO THE
OTHER WITHOUT ALLOWING THE ENGINE TO STOP. EXTREME
CARE MUST BE TAKEN AND THE FOLLOWING INSTRUCTIONS
MUST BE FOLLOWED.

Changing from Gasoline to LP Gas

1.

Start the engine from the ground control station.

2.

Open the hand valve on the LP gas supply tank by
turning counterclockwise.

BE SURE ALL GASOLINE IS EXHAUSTED BEFORE SWITCHING
TO LP GAS.

3.

While the engine is operating, place the three posi-
tion LPG/Gasoline switch at the ground control sta-
tion to the center “off” position. Allow the engine to
operate without load, until the engine begins to
“stumble” from lack of gasoline.

4.

As the engine begins to “stumble”, place the switch
to the LPG position, allowing the LP fuel to be sent
to the fuel regulator.

Changing from LP Gas to Gasoline

1.

With engine operating on LP under a no load condi-
tion, throw the LPG/Gasoline switch at the ground
control station to the “Gasoline” position.

2.

If engine “stumbles” because of lack of gasoline,
place the switch to the LPG position until engine
regains smoothness, then return the switch to the
Gasoline position. Repeat as necessary until engine
runs smoothly on gasoline.

3.

Close the hand valve on the LP gas supply tank by
turning clockwise.

3.18 ELECTRIC GOVERNOR INSTALLATION

AND ADJUSTMENTS - FORD LRG
ENGINE

General

These instructions presume no electrical test equipment
other than a multimeter for making the electrical measure-
ments called for on the following pages. If no suitable
meter is available, an inexpensive but adequate meter,
part number 22-188 is available from any local Radio
Shack store.

Many “governor problems” turn out to be installation
problems, particularly in first-time applications. Careful
attention to the directions provided will go far toward a
successful installation made in the least amount of time.

Quick-start Installations

If you are experienced in installing and adjusting Electric
Governor, follow these steps. Otherwise, refer to the more
detailed instructions starting with "MOUNTING-ACTUA-
TOR".

1.

Mount Actuator rigidly to engine location which will
permit a short, straight linkage to the carburetor or
fuel valve. Avoid very hot areas.

2.

Mount controller in a dry, fairly cool location. Acces-
sibility for adjusting is required.

3.

Wire per appropriate included schematic, using #16
wire.

4.

Set up fuel linkage. This is critical, so review the sec-
tion titled “LINKAGE”.

5.

Hold linkage for safety, and start engine.

6.

Adjust engine speed to desired valve using High
Engine pot. Turn CW to increase, CCW to decrease
speed. (See diagram on page 43 E-331 Electronics -
Adjustment Locations.)