JLG 660SJ ANSI Service Manual User Manual

Page 57

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3120718

– JLG Lift –

3-3

k. Turn cover over and push disconnect rod into

cover cap. Rod will be held in place by friction
from o-ring.

2.

Carrier Assembly.

a. Drive anti-roll pin (19) into planet shaft (17) using

a suitable punch.

b. Using a suitable press, press planet shaft from

carrier (13). After planet shaft is removed, drive
anti-roll pin from shaft.

c. Remove cluster gear (18) and thrust washers

(14) from carriers.

d. Remove sixteen needle rollers (15) from cluster

gear bore.

e. Remove spacer (16) from cluster gear bore and

remove second set of sixteen needle rollers (15).

f. Repeat steps (a) through (e) for remaining two

cluster gears.

g. Clean and inspect all parts in accordance with

Cleaning and Inspection procedures. Replace
parts as necessary.

h. Apply a coat of grease or petroleum jelly to clus-

ter gear bore.

i.

Place sixteen needle rollers into cluster gear
bore.

j.

Place spacer into opposite side of cluster gear
and against needle rollers.

k. Place second set of sixteen needle rollers into

cluster gear.

l.

Apply grease or petroleum jelly to tang side of
two thrust washers. Place thrust washers against
bosses in carrier with washer tang fitting into slot
in carrier outside diameter.

Advertising