12 foot switch adjustment, 13 boom synchronizing procedure (a models only), Foot switch adjustment -29 – JLG 660SJ ANSI Service Manual User Manual

Page 165: Boom synchronizing procedure (a models only) -29, Flow control card settings -29, Flow control card ramp time -29

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3120718

– JLG Lift –

4-29

4.12 FOOT SWITCH ADJUSTMENT

Adjust so that functions will operate when pedal is at cen-
ter of travel. If switch operates within last 1/4 in. (6.35 mm)
of travel, top or bottom, it should be adjusted.

4.13 BOOM SYNCHRONIZING PROCEDURE (A

MODELS ONLY)

NOTE: If the Lower Boom assembly does not fully lower:

1.

Remove all personnel from the platform.

2.

Pull the red knob located under the manual descent
control valve.

3.

From Ground Control, activate the lift control switch,
raise Lower Boom 6 feet (1.83m).

4.

After raising Lower Boom, release the red knob.

5.

Activate Lower Boom Down, fully lower boom.

6.

Repeat step 1 thru 5 if necessary.

Table 4-2. Flow Control Card Settings

S Models

Function

Minimum Current

Maximum Current

Lift Up

450 to 55o mA

1400 to 1500 mA

Lift Down

450 to 550 mA

1400 to 1500 mA

Swing Right

450 to 550 mA

1400 to 1500 mA

Swing Left

450 to 550 mA

1400 to 1500 mA

Flow Control

750 to 850 mA

1400 to 1500 mA

Drive Forward

40 to 60 mA

150 to 200 mA

Drive Reverse

40 to 60 mA

150 to 200 mA

A Models

Lift Up

450 to 550 mA

900 to 1000 mA

Lift Down

450 to 550 mA

1400 to 1500 mA

Swing Right

450 to 550 mA

1400 to 1500 mA

Swing Left

450 to 550 mA

1400 to 1500 mA

Flow Control

750 to 850 mA

1400 to 1500 mA

Drive Forward

50 to 60 mA

150 to 200 mA

Drive Reverse

50 to 60 mA

150 to 200 mA

Table 4-3. Flow Control Card Ramp Time

Function

Ramp Time

Lift Up

Ramp Up Time = 4:00 sec.
Ramp Down Time = 3:00 sec.

Lift Down

Ramp Up Time = 4:00 sec.
Ramp Down Time = 3:00 sec.

Swing Right

Ramp Up Time = 4:00 sec.
Ramp Down Time = 3:00 sec.

Swing Left

Ramp Up Time = 4:00 sec.
Ramp Down Time = 3:00 sec.

Drive Forward

Ramp Up Time = 4:30 sec.
Ramp Down Time = 2:30 sec.

Drive Reverse

Ramp Up Time = 4:30 sec.
Ramp Down Time = 2:30 sec.

Flow Control

Ramp Up Time = 3:00 sec.
Ramp Down Time = 0:00 sec.