Upright Level Cylinder Removal

1.

With aid of an assistant, manually override Plunger Valve
with a pry bar. From Ground Control, use auxiliary power
and extend tower telescope to access leveling cylinder
rod end pin (3).

Figure 5-5. Plunger Valve Override

2.

Position and support main boom as shown in Figure 5-
6., Boom Positioning and Support, Cylinder Repair.

3.

Remove bolt and retaining pin from leveling cylinder to
upright pin (1).

4.

Support upper boom assembly with overhead crane.
Raise boom until tension is released from cylinder pin
(1).

Figure 5-6. Boom Positioning and Support, Cylinder Repair

5.

Drive barrel end attach pin (1) through mounting holes

in upright and leveling cylinder using a suitable drift.

6.

Remove mounting hardware from upright to tower

boom assembly pivot pin (2).

7.

Drive pivot pin (2) through mounting holes in upright

and tower boom assembly using a suitable drift.

8.

Using all applicable safety precautions, operate over-

head crane to move upright and upper boom assembly

forward to clear tower boom.

9.

After moving assemblies forward, operate overhead

crane left far enough to remove leveling cylinder.

10.

Tag, disconnect, and cap level cylinder hydraulic lines.

11.

Remove mounting hardware from leveling cylinder to

tower boom fly assembly rod end pin (3).

12.

Drive leveling cylinder pin (3) through mounting holes

in tower boom fly and leveling cylinder using a suitable

drift. Remove leveling cylinder.

Upright Level Cylinder Installation

1.

Place leveling cylinder in position in tower boom. Align

holes in tower boom and leveling cylinder. Install level-

ing cylinder attach pin (3) using a suitable rubber mallet.

2.

Secure pin to tower boom with mounting hardware.

3.

Remove cylinder port plugs and hydraulic line caps and

correctly attach lines to cylinder ports.

4.

Using all applicable safety precautions, operate the

overhead crane to move upright and upper boom

assembly in proper position with tower boom.

5.

Align holes in upright and tower boom assembly and

install upright pivot pin (2) using a suitable rubber mal-

let. Secure pin with mounting hardware.

6.

Align holes in upright and leveling cylinder barrel end.

Install leveling cylinder pin (1) using a suitable rubber

mallet. Install keeper pin and bolt.

7.

Remove overhead crane from upper boom. Activate

hydraulic system.

8.

Using all applicable safety precautions, operate the

boom functions. Check for correct operation and

hydraulic leaks. Secure as necessary.

9.

Check fluid level of hydraulic tank Adjust as needed.

Turntable Ref.

Lift Cylinder Ref.

Pry Bar

Plunger Valve

Boom Support

Chain
Attach
Point

Tower Lift
Cylinder

Upright
Slave Cylinder

Overhead Crane

Advertising
This manual is related to the following products: