Assembly, Connector assembly (1 of 4) -6, Connector assembly (2 of 4) -6 – JLG 260MRT Service Manual User Manual

Page 72

Advertising
background image

SECTION 3 - GENERAL ELECTRICAL INFORMATION & SCHEMATICS

3-6

– JLG Lift –

3121801

Assembly

Check to be sure the wedge lock is in the open, or as-shipped, position (See Figure 3-6. Connector Assembly (1 of 4)). Pro-
ceed as follows:

Figure 3-6. Connector Assembly (1 of 4)

1. To insert a contact, push it straight into the appropriate circuit cavity as far as it will go (See Figure 3-7. Connector

Assembly (2 of 4)).

2. Pull back on the contact wire with a force of 1 or 2 lbs. to be sure the retention fingers are holding the contact (See Fig-

ure 3-7. Connector Assembly (2 of 4)).

3. After all required contacts have been inserted, the wedge lock must be closed to its locked position. Release the lock-

ing latches by squeezing them inward (See Figure 3-8. Connector Assembly (3 of 4)).

4. Slide the wedge lock into the housing until it is flush with the housing (See Figure 3-9. Connector Assembly (4 of 4)).

Figure 3-7. Connector Assembly (2 of 4)

Advertising