Attachment installation attachment operation – JLG G9-43A (9151-4003) Operator Manual User Manual

Page 41

Advertising
background image

Form No. 20127 • G9-43A Owner/Operator Manual

Attachment Installation

Attachment Operation

Operation of the handler equipped with carriage/fork combination is covered in

the GRADALL Material Handler Safety Manual and this Manual.

Operation of the handler when equipped with other approved attachments is

covered in this section or in separate instructions furnished with the attachment.

Any separate instructions must be kept in Manual Holder in cab with this Owner/

Operator Manual, an additional copy must be kept with the attachment if it is

equipped with a manual holder.

Take extra care when engaging, securing, manipulating, transporting and

positioning the load.

Operate a handler equipped with an attachment as a partially-loaded handler.

Pay special attention to capacity and range limits for the handler/attachment
combination.

Practice operation of handler and attachment in a safe, open area, not hazardous
to yourself, other persons, equipment or property. Become thoroughly familiar
with response of handler and attachment to controls before operating in a work

situation.

Always consider terrain between present location of load and delivery point.

Never attempt to transport a load across terrain which could cause handler to tip
over.

13.1

Always be certain that carriage or

attachment is properly positioned

on boom head and is secured by

lock pin and retainer pin. Failure to

ensure proper installation could

permit carriage/attachment/load to

disengage and cause serious injury

or death.

WARNING

!

This installation procedure is

designed for one-man operation. If

a helper is involved, shut off the

engine before proceeding to steps

4 and 5.

1. Retract Quick Switch™ (attachment tilt

lever forward) to provide clearance.

Check to be sure lock pin is secured in

out position with retainer pin.

2. Align boom head pivot with recess in

attachment. Raise boom slightly to

engage boom head pivot in recess.

4. Remove retainer pin and slide lock

pin in fully.

5. Secure lock pin in locked position using

retainer pin.

3. Engage Quick Switch™ (attachment

tilt lever backward).

6. If attachment is equipped, swing

saddles down and pin in place.

WARNING

!

Advertising