JLG 150HAX Service Manual User Manual
Page 47
Advertising
SECTION 3 - CHASSIS & TURNTABLE
3120817
– JLG Lift –
3-9
i. Place bearing cones (29) into cluster gear.
j. Place cluster gear into carrier with large gear up.
k. Slide planet shaft through carrier and cluster
gear from bottom side. Slot in planet shaft must
line up with roll pin hole in edge of carrier.
l. While holding planet shaft in position, slide cor-
rect spacer onto planet shaft.
EYE PROTECTION SHOULD BE WORN DURING RETAINING RING
INSTALLATION.
m. Place carrier on table with something under
planet shaft to hold it in correct position and
install retaining ring (25).
EYE PROTECTION SHOULD BE WORN DURING THIS OPERATION.
n. Drive roll pin (24) into carrier. Use a punch to
drive roll pin completely into planet shaft.
Advertising