Function check, Function check -5 – JLG E300 Operator Manual User Manual

Page 25

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

3121252

– JLG Lift –

2-5

9. Function Check – Once the “Walk-Around” Inspection

is complete, perform a functional check of all systems in
an area free of overhead and ground level obstructions.
Refer to Section 4 for more specific operating instruc-
tions.

IF THE MACHINE DOES NOT OPERATE PROPERLY, TURN OFF THE
MACHINE IMMEDIATELY! REPORT THE PROBLEM TO THE PROPER
MAINTENANCE PERSONNEL. DO NOT OPERATE THE MACHINE UNTIL IT
IS DECLARED SAFE FOR OPERATION.

Function Check

Perform the Function Check as follows:

1. From the ground control console with no load in the

platform:

a. Check that all guards protecting the switches or

locks are in place;

b. Operate all functions and ensure proper operation;
c. Ensure that all machine functions are disabled

when the Emergency Stop Button is pushed in.

d. Ensure all boom functions stop when the function

enable switch is released.

Advertising