Swinging the boom, Raising and lowering the upper boom, 8 function speed control – JLG E300 Operator Manual User Manual

Page 55: 9 shut down and park

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121252

– JLG Lift –

4-11

Swinging the Boom

To swing boom, use Swing control to select Right or Left
direction.

Raising and Lowering the Upper Boom

To raise or lower the Upper Boom, position Upper Boom Lift
switch to Up or Down until desired height is reached.

4.8 FUNCTION SPEED CONTROL

This control affects the speed of boom functions and plat-
form rotate Lift, Telescope, and Swing. When in the fully
counterclockwise position, Drive is placed in creep speed.

4.9 SHUT DOWN AND PARK

NOTE: When parking battery powered units overnight, batteries

should be charged in accordance with instructions in
Section 6 to ensure readiness for following workday.

NOTE: Electric machines are equipped with a static strap due to

static electricity build-ups. Strap is located under rear of
machine chassis.

The procedures to shut down and park the machine are as
follows:

1. Drive machine to a reasonably well protected area.

2. Ensure boom is lowered over rear drive axle.

Advertising