3rd generation radius cards, 3rd generation radius cards -81 – JLG 110HX Service Manual User Manual

Page 105

Advertising
background image

SECTION 2 - PROCEDURES

3120864

– JLG Lift –

2-81

3rd Generation Radius Cards

100HX Dual Capacity

1.

Length Indicator Adjustment

a. Level the frame before beginning any adjust-

ments.

b. Make all adjustments with the engine running

unless otherwise noted.

c. Fully retract the boom.

d. On the Load Radius Circuit Card, measure TP10

and insure that 10 Volts DC (+0.1/-0 Volts DC) is
present.

e. On the Load Radius Circuit Card, adjust P1 to

1.114 Volts DC while measuring TP1.

f. Make the following adjustment with the power

off.


On the Load Radius Circuit Card, disconnect
connector J2 (the 6 pin connector on the printed
circuit board). Measure between Pin (6) of the
socket connector and ground (TB1-1), adjust
potentiometer P5 to a value of 1610 Ohms (+/- 5
Ohms).

Adjust the 5K Ohm potentiometer in the boom
cable reel by loosening the three screws holding
it in place.

NOTE: When checking the resistance on the 6 pin connec-

tor as outlined in step (c), be sure to use connector
pins (6) and (3) corresponding to pins (6) and (3) on
plug 2 on the circuit card.

Rotate the 5K Ohm potentiometer until you mea-
sure 100 Ohms between Pin (3) and Pin (6) on
the 6 pin plug connector which mates with J2.


Tighten the three (3) screws on the 5K Ohm
potentiometer in the boom cable reel.

g. Turn the power on and measure TP2. It should

be 1.183 Volts DC. Re-adjust the 5K Ohm poten-
tiometer if necessary.

2.

Boom Angle Sensor Adjustment

a. With the platform level, the boom fully retracted

and at 45 (+/- 1) degrees elevation, measure the
DC voltage at TP5 on the Load Radius Circuit
Card.

b. Loosen the three screws securing the sensor to

the box and rotate the sensor until 7.1 (+/- 0.1)
Volts DC is measured at TP5. Tighten the screws
on the sensor.

c. Return the boom to horizontal.

3.

Radius Adjustment and Display Lights Setting Pro-
cedure

a. On the Load Radius Circuit Card, measure TP11

and adjust potentiometer P6 for a reading of 0.0
Volts DC.

b. On the Load Radius Circuit Card, measure TP8

and adjust potentiometer P2 for a reading of
1.585 Volts DC.

c. On the Load Radius Circuit Card, measure TP9

and adjust potentiometer P3 for a reading of
1.959 Volts DC.

d. Telescope the boom until the leading edge of

the yellow marking tape is exposed from the mid
boom. Adjust potentiometer P2 until the yellow
light just turns on and the blue light turns off.

e. Telescope the boom until the leading edge of

the red marking tape is exposed from the mid
boom. Adjust potentiometer P3 until the red light
just turns on and the yellow light turns off.

f. Measure TP2 and adjust potentiometer P4 until

TP7 measures 0.05 Volts DC more than TP2.
This determines the length of the boom (critical
length) where the lift down speed limiter is
turned on.

100HX+10 (110HXER)

1.

Length Indicator Adjustment

a. Level the frame before beginning any adjust-

ments.

b. Make all adjustments with the engine running

unless otherwise noted.

c. Fully retract the boom.

d. On the Load Radius Circuit Card, measure TP10

and insure that 10 (+0.1/-0) Volts DC is present.

e. On the Load Radius Circuit Card, adjust P1 to

1.024 Volts DC while measuring TP1.

f. Make the following adjustment with the power

off.


On the Load Radius Circuit Card, disconnect
connector J2 (the 6 pin connector on the printed
circuit board). Measure between Pin (6) of the
socket connector and ground (TB1-1), adjust
potentiometer P5 to a value of 1068 (+/- 5)
Ohms.

Adjust the 5K Ohm potentiometer in the boom
cable reel by loosening the three screws holding
it in place.

NOTE: When checking the resistance on the 6 pin connec-

tor as outlined in step (c), be sure to use connector
pins (6) and (3) corresponding to pins (6) and (3) on
plug 2 on the circuit card.

Advertising
This manual is related to the following products: