JLG 110HX Service Manual User Manual

Page 98

Advertising
background image

SECTION 2 - PROCEDURES

2-74

– JLG Lift –

3120864

c. Set TP1 on the load radius circuit card to 1.8

Volts by adjusting trimpot TP1, then proceed
with the following adjustments.

Loosen Allen screws which anchor the timing
belt pulley (1st generation) or timing gear (2nd
generation) to the shaft of the 5K pot. On 3rd
generation sensor boxes, loosen the three
screws holding the pot in place. This enables
pot/pot shaft to move freely.


Turn the ignition switch on. Adjust the 5K pot/pot
shaft until the proper voltage appears at TP2 on
the load radius circuit card and also at the green
wire on the 5K pot. (See Table 2-5 for proper
voltage.)


Tighten the Allen screws on the timing belt pul-
ley/timing gear or tighten the three screws, as
applicable.

2.

Boom Angle Sensor Adjustment.

a. With the boom completely retracted and in the 0

degrees horizontal position, measure the volt-
age at TP3 on the load radius circuit card and at
the yellow wire on the boom angle sensor.

b. Adjust the spring-loaded screw on the boom

angle sensor mounting plate (1st generation) or
the trimpot on the boom angle sensor (second
generation) until the voltage at TP3 on the load
radius circuit card and the yellow wire on the
boom angle sensor reaches the proper voltage.
For third generation sensor boxes, loosen the
three screws securing the sensor to the box and
rotate the sensor until the proper voltage read-
ing is obtained, then retighten the screws. (See
Table 2-5 for proper voltage.)

3.

Radius Adjustment.

a. With the boom completely retracted and level

horizontal, telescope the boom until the yellow
marking tape on the mid boom is exposed.

b. At this point, measure the voltage at TP6 on the

load radius circuit card. This voltage represents
the critical radius from the center line of rotation.

c. Put the voltmeter probe on TP8 and adjust P2 on

the load radius circuit card until the voltage mea-
sured at TP6 is obtained at TP8. The yellow light
on the “Reach Display” should just turn on.

d. Continue extending the boom until the red mark-

ing tape on the mid boom is exposed

e. Measure the voltage at TP6 on the load radius

circuit card. This voltage represents the critical
radius from the center line of rotation.

f. Adjust P3 on the load radius circuit card until the

voltage measured at TP6 is obtained at TP9. The
red light on the “Reach Display” should just turn
on.

NOTE: If replacing the boom radius circuit card, P4 must be

set at the same voltage as P3. The test point for P4
voltage is TP7.

4.

Operational Check.

a. With no load in the platform, raise the boom

completely and fully extend the boom.

b. Engage auxiliary power.

c. Engage LIFT DOWN until the blue light turns off

and the yellow light turns on. When the yellow
light turns on, shut down the machine and check
the boom angle. The boom angle should be 63-
67 degrees. If the boom angle is within this
range, proceed to step 4. If the boom angle is
not within this range, contact the JLG Service
Department for further assistance.

NOTE: SEE TABLE 2-4 FOR
PROPER DIMENSIONS.

Figure 2-30. Boom Marking Tape Installation - 100HX+10 and 110HXER

Advertising
This manual is related to the following products: