21 swing brake - ausco - machines built to 1992, Disassembly, Swing brake - ausco - machines built to 1992 -59 – JLG 110HX Service Manual User Manual

Page 83: Disassembly -59

Advertising
background image

SECTION 2 - PROCEDURES

3120864

– JLG Lift –

2-59

o’clock, and one bottom gear at six o’clock as
shown in Figure 2-19.

b. Find marked (punch mark) teeth on large gears.

Rotate gears until punch mark is located in a
straight up, 12 o’clock, position. Punch marks at
ten o’clock and two o’clock will be located just
under edge of carrier and not readily visible.

5.

Place ring gear (7) over cluster gears (11), with
raised shoulder of ring gear facing down.

6.

While holding ring gear (7) in position, invert carrier
assembly (10) so that ring gear and larger diameter
of cluster gears (11) are facing down.

7.

Apply a light coating of petroleum jelly or multi-pur-
pose grease to inner thrust washer (8) and thrust
bearing (9).

8.

Position thrust washer (8), thrust bearing (9), and
thrust washer (8) into applicable groove of carrier
assembly (10).

9.

Apply a light coating of petroleum jelly or multi-pur-
pose grease to new inner o-ring (6).

10.

Position o-ring (6) in groove in hub (24).

11.

While holding ring gear (7) and carrier assembly
(10), insert smaller diameter of cluster gears (11)
into internal gear (19).

12.

Rotate ring gear (7) until hole marked “X” is located
over hub shaft assembly (24).

13.

Insert input gear (18) into carrier assembly (10) so
that input gear and larger diameter of cluster gears
(11) are in mesh. Check that carrier assembly (10)
rotates freely.

14.

Position thrust washer (17) on shaft of input gear
(18).

15.

Apply a light coating of petroleum jelly or multi-pur-
pose grease to new outer o-ring (6).

16.

Position o-ring (6) into groove of cover (1).

17.

Apply a light coating of petroleum jelly or multi-pur-
pose grease to outer thrust washers (8) and thrust
bearing (9).

18.

Position outer thrust washer (8), thrust bearing (9)
and thrust washer (8) in cover (1).

19.

Position cover (1) on ring gear (7) with oil check
plug (5) in cover located at 90° from oil fill plugs (25
and 26) in hub (24).

20.

Install four shoulder bolts (3) and lockwashers (4)
into appropriate counterbored holes in hub (24).

21.

Install eight bolts (2) which attach cover (1) to ring
gear (7) and hub (24) and tighten to a torque of 3.2-
3.7 kgm.

22.

Carefully install hub pinion gear on splined output
shaft. If necessary, gently tap into position with a soft
headed mallet.

23.

Apply No. 2 Lift Grade Loctite to pinion gear retain-
ing plate screws.

24.

Position gear retaining plate and install attaching
screws.

25.

Remove oil fill plug (25 or 26) and fill hub assembly
with approximately one quart of approved extreme
pressure gear lubricant. Install fill plug.

2.21 SWING BRAKE - AUSCO - MACHINES

BUILT TO 1992

Disassembly

1.

With shaft protruding downward, remove bolts (22)
alternately and evenly to reduce spring tension.

2.

Remove power plate (21) and gasket (2).

3.

Bearing (18) is pressed onto shaft (7) and must be
removed before removal of rotating discs (11) and
stationary discs (12).

4.

Further disassembly is not recommended unless
necessary for the replacement of specific parts.

5.

If further disassembly is required, remove shaft (7)
and stack sub-assembly from housing (1) by lightly
tapping or pressing on the small external spline end
of the shaft and removing the shaft, bearings and
stack from housing.

6.

Remove bearing (18), stationary disc (12), rotating
disc (11), springs (10) and primary disc 9.

7.

Remove bearing (3) from shaft, taking care not to
damage seal 4. Remove seal.

8.

Remove springs (6) and spring retainer (5) from
housing.

9.

Remove piston (13) from power plate by introducing
low pressure air (15 psi [10 bar]) into the hydraulic
inlet. Direct piston away from operator.

10.

Remove o-rings (15 and 17) and back-up rings (14
and 16) from piston OD and ID grooves. Back-up
rings will be damaged and should not be removed if
replacement is not planned.

11.

Pressure relief valve (23) can be removed and
inspected to assure spring loaded ball moves freely
and is contamination free.