Flush mounting – classic bricks, Flush mounting – plasterboard – 2N Helios IP Uni User Manual

Page 13

Advertising
background image

13

2N TELEKOMUNIKACE a.s., www.2n.cz

®

1.

2.

3.

4.
5.

6.

7.
8.

9.

10.

Flush Mounting – Classic Bricks

Cut a wall hole using the template enclosed. Make sure that all
the required cables are available in the hole.
Unpack the plastic mounting box. Break out the cable holes as
necessary and make sure that the wall hole is big enough for the
box.
Wall up the mounting box making sure that the box is aligned
with the wall surface. Wait until the plaster (mortar, mounting
foam, etc.) sets.
Unscrew the front panel from the door intercom.
Connect the cables to the terminals or RJ connector as described
in the

subsection.

Electric Connection

You can use the cable tie for connection as shown:

Suggested cable fixation
Mounting completion – after electric installation!
Insert the intercom in the mounting box in the wall.
Tighten the intercom with the stainless steel screws included in
the delivery. As the screw holes are oval, you can perfect the
vertical position before tightening.
We do not recommend you to insert the button tags now.
Replace the stainless steel front panel fixing it with the stainless
steel screws you unscrewed in step 4 above.

Flush Mounting – Plasterboard

Tip

If this is your first plasterboard installation,
check the function of the intercom side
clamps. Loosen and then re-tighten the
clamp screw to see how it turns
automatically and starts moving forwards in
its slot. Remember to return the clamp into
the original position after the check!

Advertising