4.3 Order of steps during commissioning

Removing the lid from the service slot

Loosen the undetachable screws on the service slot cover by using a Torx Tx10 screw driver and
subsequently remove the service slot cover from the device.

Fig. 8:

Connecting the cables

Please connect all required cables. Always use the grommets to correctly install the cables.

Information:

A cable installation kit, which includes grommets for several cable diameters,
is available as an option.