Operating manual – BAND-IT BT1000 Boss Tool User Manual

Page 7

Advertising
background image

BT1000

BOSS

TM

Tool

www.band-it-idex.com

Document # P98750 Rev. B

©

Copyright

BAND-IT-IDEX, Inc. 2013

All rights reserved

Page 7

BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-624-3925

Operating Manual

BT1000 BOSS

TM

Tool Manual

Operation

3. Tensioning the band/strap
Press down the tension valve lever.
The lever is caught completely and the band is tensioned until
the air motor stalls. If the cycle has to be interrupted, the catch
has to be released to the left.

4. Sealing the band
The sealing valve lever is pressed down until the seal is
notched and the upper band sealed; the tensioning process is
interrupted (tension released) automatically.

Advertising