It1000-ab, Maintenance, 26 of 38 – BAND-IT IT1000-AB 1/4 Tie-Lok Tool User Manual
Page 26: 1/4” tie-lok, Tool
Advertising

Document # I17791 Rev H
© Copyright
BAND-IT-IDEX, Inc. 2009
All rights reserved
www.BAND-IT-IDEX.com
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street Denver, CO 80216-0307 USA
P: 1-800-525-0758 F: 1-800-624-3925
26 of 38
IT1000-AB
1/4” Tie-Lok
®
Tool
5) Lubricate the removed cover as shown with red arrows above. Also, lubricate the tool
body, linkage and Tension Block Assembly as shown on page 27.
6) Inspect all mechanical linkage for lubrication, proper placement and re-fit cover.
7) Secure the tool side cover by inserting and tensioning (2) #10
– 32 X 4” length cap
screws through the Cylinder Housing and into the Cover. Apply a light dab of Blue-
Medium Loctite to one or two threads to prevent loosening during operation.
Maintenance
Advertising