Installation instructions – CHAMPION EUCC Series User Manual
Page 37
Advertising
![background image](/manuals/556184/37/background.png)
29
29. Make sure the sections are
adjusted to the same height.
30. Check the alignment of the
conveyor tracks inside the
machine and adjust tracks if
necessary. Tracks should align
if the sections are level.
31. Bolt all the HOOD sections
together with twenty (20), 5/16-
18 X 3/4" bolts, lockwashers and
nuts included in the hardware kit.
32. Tighten the hood bolts in a
cross-pattern to pull the sections
together.
33. Silicon sealant should squeeze
out of the section joints.
_________ Installation Instructions
Section Assembly:
Section Assembly
Advertising