Feiss FM390 User Manual

Cadence 2 light flush mount, Installation instructions for, Ceiling fm390

Advertising
background image

1

Installation Instructions for

Cadence 2 Light Flush Mount

1.0

FM390

Ceiling

FM390_

G

P

I

:

ENERAL

RODUCT NFORMATION

This product is listed by one of the following
“ ationally

ecognized

esting aboratory”

N

R

T

L

This product is suitable for damp locations.

This product may be dimmed with a standard incandescent dimmer.

This instruction shows a typical installation.

Follow enclosed supplement installation instructions for electrical and fixture installation onto house outlet box.

Place the fixture base over the threaded nipple and secure it in place with the cap nut.

Screw the lamps into the sockets. Refer to the label on the lamp socket for Max Wattage information.

Install the shade by aligning it with the fixture base, then using the thumb screws to secure them together.

1

2

1A

1

LAMP

SHADE

1

3

THUMB SCREW

SOCKET

4

CAUTION - RISK OF FIRE

This product must be installed in accordance with
the applicable installation code by a person familiar
with the construction and operation of the product
and the hazards involved.

Use minimum 90°c supply conductors.

4

1

2

3

3

4

CAP NUT

THREADED NIPPLE

Advertising